File D1 - Plans divers

Title and statement of responsibility area

Title proper

Plans divers

General material designation

Parallel title

Other title information

Title statements of responsibility

Title notes

Level of description

File

Reference code

CA P121,S22,D1

Edition area

Edition statement

Edition statement of responsibility

Class of material specific details area

Statement of scale (cartographic)

Statement of projection (cartographic)

Statement of coordinates (cartographic)

Statement of scale (architectural)

Issuing jurisdiction and denomination (philatelic)

Dates of creation area

Date(s)

  • 1958-1988 (Creation)

Physical description area

Physical description

76 plans.

Publisher's series area

Title proper of publisher's series

Parallel titles of publisher's series

Other title information of publisher's series

Statement of responsibility relating to publisher's series

Numbering within publisher's series

Note on publisher's series

Archival description area

Custodial history

Scope and content

Plan: Avant-projet prélimnaire de la rivière Chamouchouane. Plan: Springer #2 Proposed sheeting 4 sides of compartements, from collar to crawl Beam. Plan: proposed alterations Opémiska curling club avril 1965. Plan: G. A. of Quick - Change Shaft Guide Cage (Springer #1) 22 septembre 1967. Plan: Perry Water Bailer (Do not scale) Juin 1968. Plan: This drivg. is traced from Canadian ingersoll Rand Co. Limited. This orig. drivg. was certified by Canadian Ingersoll Rand Co. - tracing made for our own use only. Gén. & foundation plan 24 ‘4 & 14 ‘2 x 10 x Le - 2 comp. 11 février 1970. Plan: Showing location of Pipe Boxes & installed radiation. 23 août 1966. Plan: Steel cheave deck Robitaille Shaft 20 juin 1966. Plan: Steel détails - 80 ‘ H. Frame stell deck to suit “Robitaille” shaft. 09 juillet 1966. Plan: Steel details & Girders “Robitaille” steel deck . 30 juin 1966. Plan: Dumping arrangement & supporting steel for 120 c/f Bottom dump skips - Falconbridge Nickel Mines Ltd - Perry shaft. 10 février 1970. Plan: Tracing made for our own use only - only one copy arrived from wabi iron works Ltd. 10 février 1970. Plan: Showing locations of lights, Sprinklers Heads & prop. Baffles & Sensors. 18 septembre 1968. Plan: Moveable Heater Bldg. for exist reznor olson Heater (right Hand unit). septembre 1965. Plan: Moveable Heater Bldg for existing reznor olson Heater (right Hand unit). octobre 1965. Plan: Fan Building for 167 serv. rse Vent Collar - Perry mine. octobre 1965. Plan: Locking Collar & Nut 5 ½’ short head crusher. Mai 1965. Plan: Proposed arrangement of reznor - Olson Heaters à I Perry 167 vent Rse novembre 1965. Plan: Sketch showing car spotter & stop. Plan: Record of Beam movement at Koepe Hoist support Springer 2 shaft tower. février 1964. Plan: Perry U/g Hoistroom 10” crawler Beam Loc’ns, 22 juin 1966. Hoist at 12 levels. Plan: Bulkhead over the she ave where as of the Perry deepenning. 16 juin 1966. Plan: Sheave Support - Perry Deep top of Rope raise - #3 et 4 compts Showing Beam detail & Final arrangement 29 juin 1966. Plan: LHD Tire-Care for Perry 30 avril 1969. Plan: Proposed Trestle extension to carry 6” Woodstave & Walkaway. 12 février 1968. Plan: Opémiska Copper Mines (Qué.) Ltd Section Showing Tailing - Dams (s.d.) Plan: Profile Looking North (approx. elev only) (s.d.) Plan: Proposal - Trestle Bent 33 ft. High (Max.) 12 février 1968. Plan: Springer #1 change proposed alterations 24 avril 1967, Proposal #2 Springer dry proposed changes & annex décembre 1966, Front view showing wall opening for floor drain -1”=1’ -0” detail shower toilet area clean dry Springer I 12 mars 1967, Turn Down 1967 alterations mine dry - west end 05 avril 1967. Plan: Installation of heat MSM416 pump at ware house. 03 juin 1981, MSM417 ware house and machine shop 03 juin 1981, MSM418 compressor house and hoist room 03 juin 1981, MSM414 Proposed system to heat buildings with water from compressor using heat pump. 03 juin 1981. MSM415 office heat pump installation, 03 juin 1981. Plan: Tailing disposal area, Janvier 1977. Plan: Hoist Foundation plan 27 septembre 1988. Plan: Falconbridge Copper Limited Springer Plant Opémiska Division Chapais octobre 1980. Sommaires des performances Opémiska 1936-1982. Plan: Opémiska Copper Mines (Québec) Ltd surface (s.d.). Plan: Perry 12’ Level Hoistroom 1&2 01 avril 1966. Plan: Actual Perry deepening 26 janvier 1968. Plan: Opémiska Copper Mines (Québec) Limited scale -1”=40’ shaft layouts (s.d.). Plan: Reparations du Club de curling 11 juin 1981. Plan: Opemiska Mining concession (s.d.). Plan: D.H.F., Z50 - Mine Air Heater - 100,000 C.F.M. 09 mars 1970. Plan: Carte topographique Chapais, Québec Juillet 1960. Plan: Carte Exploration propriété Bourbeau - Ouest - Claim map (East sheet) novembre 1985. Plan: Gen arr. of 45 cuft dump alum. & steel skip for Perry Shaft. 6 août 1968. Plan: Caloritech Division Casah Heating system Inc. Low pressure Steam Boiler HSB-48-2160/2520, 600V3Ø2160 kw. 20 avril 1983. Plan: Caloritech Division Casah Heating systems Inc. Low pressure steam Boiler VSB-42-720, 600v 3 Ø 720 kw 21 avril 1983. Plan: Caloritech Division Casah Heating systems Inc. Low pressure steam Boiler VSB-42-600/1120 600v 3 Ø 600-1120 kw 21 avril 1983. Plan: Proposed alterations 23’ X36’ Bungalow 08 juin 1965. Plan: Pilot Plan 25’6” X 46’0” Bungalow juin 1965. Plan: Pilot Plan - Lots No: 8-62 to 8-69 Plan d’implantation - Town of Chapais Abitibi-Est 14 juin 1973. Plan: Hoist & Headframe Cooke Shaft 18 décembre 1972. Plan: Springer #2 Shaft contractors rockwork revised 04 juin 1958. Plan: Suggested clam for 15” Tailings line mai 1981. Plan: X Section thru’Dam (at natural Steambed) Seale: None 1967. Plan: UBD 720 Axe Mancha 4 tonnes 09 juillet 1984. Plan: UBD 721 Axe Mancha 4 tonnes 09 juillet 1984. Plan: UBD 730 Braouette de dump Wagon 140 pi³ 20 novembre 1986. Plan de localisation. Plan: Shaft Timber detail Juillet 1976. Plan: Caging Dimensions Janvier 1979. Description & dessin de Boulons (s.d.). Ploids d’ingénieurs en bois.

Notes area

Physical condition

Immediate source of acquisition

Arrangement

Language of material

  • French
  • English

Script of material

Location of originals

Availability of other formats

Restrictions on access

Terms governing use, reproduction, and publication

Finding aids

Associated materials

Related materials

Accruals

General note

Ancienne cote : P07-22.01

Alternative identifier(s)

Standard number area

Standard number

Subject access points

Place access points

Name access points

Genre access points

Control area

Description record identifier

Institution identifier

Rules or conventions

Status

Dates of creation, revision and deletion

Language of description

Script of description

Sources

Accession area

Related subjects

Related people and organizations

Related places

Related genres