Identifiant
|
Titre
|
Niveau de description
|
Date
|
Document numérique |
|
|
D1 |
Plans divers |
Dossier |
1958-1988 |
|
|
|
P5 |
Plan: Perry Water Bailer, 1968 |
Pièce |
|
|
|
|
P12 |
PIan: Tracing made for our own use from Wabi Iron works Ltd. 1970 |
Pièce |
|
|
|
|
P13 |
Plan : light, sprinklers, 1965 |
Pièce |
|
|
|
|
P26 |
Plan: Opémiska Copper Mines (s.d.) |
Pièce |
|
|
|
|
P27 |
Plan: Profile Looking North, (s.d.) |
Pièce |
|
|
|
|
P29 |
- Plans: Springer #1-2 change proposed, 1966-1967 |
Pièce |
|
|
|
|
P37 |
Plan: Perry shaft deepending, 1968 |
Pièce |
|
|
|
|
P40 |
Plan: 0pemiska Mining concession (s.d. ) |
Pièce |
|
|
|
|
P42 |
Carte topographique, Chapais, 1960 |
Pièce |
|
|
|
|
P43 |
Carte Exploration propriété Bourbeau-Ouest, Claim, 1985 |
Pièce |
|
|
|
|
P48 |
Plan: BungaIow, Chapais, 1965 |
Pièce |
|
|
|
|
P3 |
Plan: proposed alterations Opémiska curling club, 1965 |
Pièce |
|
|
|
|
P4 |
PIan: G. A. of Quick - Change Shaft Guide Cage (Springer # 1), 1967 |
Pièce |
|
|
|
|
P6 |
Plan from Canadian ingersoll Rand Co Limited, 1970 |
Pièce |
|
|
|
|
P7 |
Plan : Showing location of Pipe Boxes & installed radiation, 1966 |
Pièce |
|
|
|
|
P17 |
- Plan: Locking Collar & Nut 5 1/2,short head crusher, 1965 |
Pièce |
|
|
|
|
P19 |
Plan : Sketch showing car spotter & stop, (s.d.) |
Pièce |
|
|
|
|
P28 |
Plan: Proposal - Trestle Bent, 1968 |
Pièce |
|
|
|
|
P32 |
Plan: Hoist Foundation Plan, 1988 |
Pièce |
|
|
|
|
P36 |
Plan: Perry 12r Level Hoistroom 1 & 2, 1966 |
Pièce |
|
|
|
|
P44 |
Plan: Gen arr. of 45 cuft dump alum. & steel skip for Perry Shaft, 1968 |
Pièce |
|
|
|
|
P49 |
Pilot Plan - Lots No: 8-62 to 8-69 PIan d'implantation - Town of Chapais Abitibi-Est, 1973 |
Pièce |
|
|
|
|
P51 |
Plan: Springer # 2 Shaft contractors rockwork'revised, 1958 |
Pièce |
|
|
|
|
P52 |
Plan Suggested clam for l5" Tailings line,1981 |
Pièce |
|
|
|
|
P54 |
Plan USD 720, 1984 |
Pièce |
|
|
|
|
P56 |
Plan: UBD 730 Braouette de dump Wagon 140 Pi. 20 novembre 1986 |
Pièce |
|
|
|
|
P58 |
Plan Shaft Timber detail, JuiIlet 1976 |
Pièce |
|
|
|
|
P60 |
Description & dessin de Boulons (s.d.) |
Pièce |
|
|
|
|
P1 |
Plan: Avant-projet préliminaire de la rivière Chamouchouane, (s.d.) |
Pièce |
|
|
|
|
P9 |
Plan: Steel détails - 80 ' H. Frame stelI deck to suit "RobitaiIIe" shaft, 1966 |
Pièce |
|
|
|
|
P10 |
Plan: Steel details & Girders Robitaille mine, 1966 |
Pièce |
|
|
|
|
P11 |
Plan: Dumping arrangement & supporting steel, 1970 |
Pièce |
|
|
|
|
P14 |
Moveable Heater BIdg for existing reznor olson Heater, 1965 |
Pièce |
|
|
|
|
P16 |
PIan: Fan Building for 167 servr. se Vent Collar - Perry mine, 1965 |
Pièce |
|
|
|
|
P20 |
Plan : record of beam movement at Koepe Hoist, 1966 |
Pièce |
|
|
|
|
P21 |
Plan: Perry U/g Hoistroo Beam Loc 'ns, 1966 |
Pièce |
|
|
|
|
P25 |
Plan: Proposed Trestle extension to carry 6" Woodstave & Walkway, 1968 |
Pièce |
|
|
|
|
P31 |
PIan: TaiIing disposal area, 1977 |
Pièce |
|
|
|
|
P35 |
Plan: Opémiska Copper Mines Ltd surface (s.d.) |
Pièce |
|
|
|
|
P38 |
Plan: Opémiska Copper Mines Ltd shaft layout (s.d.) |
Pièce |
|
|
|
|
P46 |
Plan low pressure steam Boiler, 1983 |
Pièce |
|
|
|
|
P50 |
PIan: Hoist & Headframe Cooke Shaft,1972 |
Pièce |
|
|
|
|
P53 |
Plan X Section thru'Dam 1967 |
Pièce |
|
|
|
|
P55 |
Plan USD 721, 1984 |
Pièce |
|
|
|
|
P57 |
Plan de Iocalisation |
Pièce |
|
|
|
|
P61 |
Ploids d'ingénieurs en bois |
Pièce |
|
|
|
|
P2 |
Plan: Springer #2 Proposed sheeting 4 sides of compartements, from collar to crawl Beam, (s.d.) |
Pièce |
|
|
|
|
P8 |
Plan: Steel cheave deck Robitaille Shaft, 1966 |
Pièce |
|
|
|
|
P15 |
Plan: Moveable Heater BIdg for existing reznor olson Heater, 1965 |
Pièce |
|
|
|
|
P18 |
P]an: Proposed arraeaters at 1 Perry 167, 1965 |
Pièce |
|
|
|
|
P22 |
Plan: Bulkhead over the she ave where as of the Perry deepenning, 1966 |
Pièce |
|
|
|
|
P23 |
PIan: Sheave Support - perry Deep top of Rope raise - # 3 et 4 compt Showing Beam détail & Final arrangement, 1966 |
Pièce |
|
|
|
|
P24 |
Plan: LHD Tire-Care for Perry, 1969 |
Pièce |
|
|
|
|
P30 |
Plan: Installation of heat MSM416, 1981 |
Pièce |
|
|
|
|
P33 |
Plan: Falconbridge Copper Limited Springer Plant Opémiska Division Chapais, 1980 |
Pièce |
|
|
|
|
P34 |
Sommaires des performances Opémiska, 1936-1982 |
Pièce |
|
|
|
|
P39 |
Plan: Réparations du Club de curling Chapais, 1981 |
Pièce |
|
|
|
|
P41 |
PIan: D.H.F. 250 - Mine Air Heater, 1970 |
Pièce |
|
|
|
|
P45 |
Plan low pressure steam Boiler, 1983 |
Pièce |
|
|
|
|
P47 |
Plan low pressure steam Boiler, 1983 |
Pièce |
|
|
|
|
P59 |
Plan Caging Dimensions, Janvier1979 |
Pièce |
|
|
|